Short Summary
- Heavy U-Drains are high-strength, high-load precast channels (Trilok uses high-performance concrete such as M50) made to take vehicular axle & wheel loads and industrial use.
- Light U-Drains are cost-effective, lighter-duty precast channels designed for pedestrian areas, residential, and light commercial drainage where heavy vehicle loads are not expected.
Material & Manufacturing Differences
- Concrete grade & mix – Trilok advertises high-performance mixes (M50 and higher) for heavy products to ensure strength, durability, and reduced maintenance; light drains use standard precast mixes optimized for economy while still meeting structural needs. This difference affects compressive strength, abrasion resistance, and longevity.
- Reinforcement & inserts – Heavy sections typically have more reinforcement, larger lifting inserts/anchors, and thicker webs/bases so they can be handled by cranes and carry higher live loads. The brochure shows lifting inserts and grooves for joints for both product types.

Sizes & Load Ratings (what Trilok offers)
- Standard lengths: Units are usually supplied in 2000 mm lengths (common on the Trilok brochure). Standard width/height sizes range from 300×300 up to 1200×1200 (mm) for the U-drains, with various internal heights (H) depending on type and size.
- Load ratings: The brochure shows explicit load ratings for covers and axle loads — heavy drains have design ratings (example: many sizes in the heavy range are indicated for 5-ton to 10-ton axle loads depending on size and cover arrangement).
Light drains are shown with much lower live-load design (example: light units are intended for around 1 T/m² or pedestrian/light traffic conditions). For exact per-size ratings, always refer to the product table in the brochure.
Typical applications
Heavy U-Drains – use when:
- Along highways and expressways, road shoulders and medians are where heavy axle loads pass.
- Industrial yards, logistics parks, and truck parking/storage yards are where repeated heavy loads and dynamic wheel forces occur.
- Power cable/telecom ducts under vehicular routes (when a cover has to carry traffic loads).
Light U-Drains – use when:
- Residential layouts, parks, footpaths, light commercial campuses, pedestrian, and light-vehicle runoff.
- Temporary work sites or smaller landscape drainage where a fast, low-cost solution is needed.
Installation & Foundation Differences
Trilok’s brochure shows typical installation sections – both types follow similar steps, but with different foundation specifications:
Typical installation sequence:
Excavate trench to the required depth and line/grade.
- Foundation layer – For heavy drains, a stronger foundation is shown (e.g., well-compacted crushed stone + 100 mm PCC or specified levelling concrete). For light drains, a thinner levelling concrete/mortar bed is acceptable.
- Place unit– Using crane and lifting inserts (Trilok provides lifting inserts / lifting barrel details). Align units and ensure the groove for jointing matches.
- Jointing – Mortar or rubber-gasket joint details are used depending on hydraulic and settlement requirements; the brochure shows groove/joint details.
- Covers/gratings – Choose covers rated to expected traffic (pedestrian/grating vs heavy wheel-load covers). The standard cover details and load carrying capacity are shown in the brochure tables.
- Backfill & compaction – Staged compaction to avoid settlement and lateral movement. For heavy-duty installations, use controlled compaction and materials as per spec.
Hydraulic & Geometric Considerations
- Flow capacity depends on the internal cross-section (width × depth) and slope. Heavy drains often have deeper/heavier profiles that increase conveyance for stormwater; light drains are shallower. The brochure shows internal dimensions (A, B, H) for each size — use those when calculating open channel flow (Manning’s equation).
- Invert levels & slope – For long runs, provide a nominal fall (e.g., Trilok mentions typical construction practice details such as a nominal slope in PCC if required). Proper design prevents ponding and sedimentation.
Durability, Maintenance & Lifecycle
- Heavy drains (M50 or similar) will resist abrasion, impact, and chemical attack better, longer service life, and require lower maintenance in heavy-use areas.
- Light drains are economical but may need earlier replacement or more frequent inspection if inadvertently exposed to heavy truck loads. Use covers and signage to limit misuse.
- Cleaning & access – Both types should have manhole/access points planned at intervals for de-siltation, especially in areas with high sediment load. Trilok’s product literature highlights ease and speed of precast installation as a benefit for maintenance planning.
Cost & Procurement Tradeoffs
- Initial cost: Light drains are cheaper per meter and lighter to transport/handle.
- Life-cycle cost: Heavy drains cost more up front but typically give lower life-cycle cost for heavy-use projects because they resist damage and need fewer replacements. (Trilok’s benefits write-up emphasizes precast’s time/cost advantages for projects.)
Quick Decision Checklist
Pick Heavy U-Drains if any of these apply:
- Project next to a public highway or truck route.
- Expected regular axle loads ≥ 5-10 tonnes or frequent heavy traffic.
- Industrial/port/logistics area with heavy wheel loads.
- Need for long design life with minimal maintenance.
Pick Light U-Drains if all of these apply:
- Site is residential, park, garden, or low-traffic commercial.
- Maximum live load is pedestrian/light vehicle (around 1 T/m² design intent).
- Budget constraints and limited structural demands.
Real Examples (How Trilok Positions Them)
- Trilok shows heavy U-shape drains being used for stormwater drains, power & telecom ducts under traffic zones, and heavy infrastructure projects.
- Light U-drains are promoted for cost-effective stormwater channels in residential and light commercial sites.
Practical Note for Spec Writers/Engineers
Always ask for:
- The expected design wheel/axle loads.
- Traffic frequency.
- Soil bearing capacity and groundwater condition
- Hydraulic flow estimate (Q)
- Any exposure to chemicals or abrasion.
Then match these to the per-size load ratings and foundation details shown in the Trilok brochure before choosing heavy vs light. The brochure PDF is the authoritative per-size reference.